Odin View Apartments – Greenburg
Projects We’re bringing together the best of Morris Knowles & Associates and Hammontree & Associates to create a stronger, more
Full Service Engineering, Surveying and Planning
In eliminating old corroded water lines within the rear yards of residents, PDG and Authority met with the residents to reroute their service lines at no cost to them. Six (6) new customers were tied into the system. PDG worked with Antis Township to acquire additional easements through unimproved roadway.
The Bellwood Borough Authority requested Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation to replace an existing corroded 2” diameter cast iron water line with a 6” (3,200 LF) and 8” (1000 LF) diameter C-900 PVC water main to improve water volume, pressure and adequate fire flow for the installation of new fire hydrants for existing customers along East 9th Street, East 8TH Street, East 7th Street and South Tuckahoe Street in Antis Township.
Project Client:
Bellwood Borough Authority
Project Location:
Blair County
Services Included:
Design
Plan Preparation
Easement Plats
Construction Management
Bidding
Easement Surveys

Projects We’re bringing together the best of Morris Knowles & Associates and Hammontree & Associates to create a stronger, more

The Bellwood Borough Authority contracted Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation.

Penn Trafford School District requested Point Design Group to assist with preparing plans and specifications and contract award administration for pipe bursting sections of badly broken sanitary sewer lines next to and around their football stadium due to sewer water escaping and penetrating through an embankment onto neighboring property.

Point Design Group was hired by the Upper Tyrone Township Sewage Authority to design a new sanitary system for 602 residents which had failing private on-lot systems.

Point Design Group performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.

Point Design Group was hired by the City of Canton to design the bank stabilization and 72″ sanitary sewer replacement for an area where the bank was slipping towards the creek.