Odin View Apartments – Greenburg
Projects We’re bringing together the best of Morris Knowles & Associates and Hammontree & Associates to create a stronger, more
Full Service Engineering, Surveying and Planning
Point Design Group developed utility and roadway improvement plans to assist the Village in reducing lost water, maintenance, and other costs associated with aging infrastructure.
Point Design Group partnered with the Village of Lakemore, Ohio, to provide surveying and engineering for the Fairdale and Michaels Utility Improvement Project. The project involved water main replacement, both sanitary sewer rehabilitation and replacement, storm sewer improvements, and full depth roadway replacement on Fairdale Drive and Michaels Drive.
In addition to design services, Point Design Group worked with Enbridge to relocate the gas lines in the project area and provided contract administration and construction observation services. The project comprised over 2,200’ of roadway, water, and sewer improvements, including sanitary lateral rehabilitation. Additionally, our survey crew provided base-mapping and construction staking. The total project was valued at more than $1.6 million.
Project Client:
Village of Lakemore
Project Location:
Summit County
Services Included:
Water Main Design
Sanitary Sewer Design
Survey & Base Mapping
Permit Assistance
Contract & Construction Administration
Construction Observation

Projects We’re bringing together the best of Morris Knowles & Associates and Hammontree & Associates to create a stronger, more

The Bellwood Borough Authority contracted Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation.

Penn Trafford School District requested Point Design Group to assist with preparing plans and specifications and contract award administration for pipe bursting sections of badly broken sanitary sewer lines next to and around their football stadium due to sewer water escaping and penetrating through an embankment onto neighboring property.

Point Design Group was hired by the Upper Tyrone Township Sewage Authority to design a new sanitary system for 602 residents which had failing private on-lot systems.

Point Design Group performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.

Point Design Group was hired by the City of Canton to design the bank stabilization and 72″ sanitary sewer replacement for an area where the bank was slipping towards the creek.