Kennard Road Bridge

Point Design Group was hired by the Medina County Engineer for the replacement of a deficient single span steel beam bridge. 

Kennard Road Bridge over a calm stream, surrounded by trees and snow, with a clear blue sky in the background.

The new replacement structure is an 83-foot single span concrete box beam superstructure with a composite deck. This new bridge is supported on an integral rear abutment and a semi-integral forward abutment. The new structure was built with zero skew, eliminating a variable beam length.

Facebook
X
LinkedIn
Email
WhatsApp

Project Client:

Medina County Engineer

Project Location:

Medina County

Services Included:

Bridge Design

Site Survey

Roadway Design

Maintenance of Traffic Design

Construction workers and heavy machinery work on road paving in St Clair Township surrounded by greenery.
Transportation

St Clair Township – CBDG Road Paving

Point Design Group was contracted by St. Clair Township in Westmoreland County to provide engineering design and construction period services on three roadway widening and surfacing projects within the Township.

View Project
Wooden pedestrian bridge over the water, supported by stone pillars, surrounded by bare trees and blue sky near the Ohio & Erie Canal.
Transportation

Ohio & Erie Canal Aqueduct

The 14-foot wide bridge reconnects the Ohio & Erie Canal towpath at a location where an aqueduct once transported canal boats over the river. The reemergence of the towpath as a recreational corridor was the driving force in providing this safe passage along this section of the towpath.

View Project
Covered parking area at Akron Canton Airport with a clear blue sky in the background.
Transportation

Akron Canton Airport Entrance Road

Point Design Group identified alternatives that not only improved the pavement conditions, drainage, and lighting on the Akron-Canton Airport entrance road and parking areas but also reduced congestion in front of the terminal and simplified ingress and egress.

View Project
Multi-use bridge featuring a concrete surface and wooden railing, surrounded by trees and a pathway.
Transportation

TUS-77-32.72 Multi-Use Bridge

Point Design Group team was hired by the Stark Park District to complete the planning and design for this bridge over IR-77 that reconnects the Ohio & Erie Canal Towpath between Fort Laurens in Bolivar and the Village of Zoar.