Liberty Street Bridge Design-Build

Point Design Group teamed with Marucci & Gaffney for a design-build project to replace a deficient steel truss bridge over Camp Creek and a concrete dam in Garresttsville, Portage County, Ohio.

Newly constructed Liberty Street Bridge featuring a smooth asphalt surface and sleek guardrails surrounded by lush greenery.

This new, 87-foot long, Liberty Street Bridge is a galvanized steel beam structure featuring semi-integral abutments on drilled shafts, which were selected to minimize impacts to the existing dam. A water line is carried on the bridge as well as a sidewalk and pedestrian railing. Additional storm sewers were constructed as part of the project to improve drainage.

Facebook
X
LinkedIn
Email
WhatsApp
Concrete bridge with a flat surface, surrounded by greenery and rocky terrain, illustrating the Liberty Street Bridge design.

Project Partner:

Marucci & Gaffney

Project Location:

Portage County

Services Included:

Bridge Design

Drainage Design

Roadway Design

Surveying

Construction workers and heavy machinery work on road paving in St Clair Township surrounded by greenery.
Transportation

St Clair Township – CBDG Road Paving

Point Design Group was contracted by St. Clair Township in Westmoreland County to provide engineering design and construction period services on three roadway widening and surfacing projects within the Township.

View Project
Wooden pedestrian bridge over the water, supported by stone pillars, surrounded by bare trees and blue sky near the Ohio & Erie Canal.
Transportation

Ohio & Erie Canal Aqueduct

The 14-foot wide bridge reconnects the Ohio & Erie Canal towpath at a location where an aqueduct once transported canal boats over the river. The reemergence of the towpath as a recreational corridor was the driving force in providing this safe passage along this section of the towpath.

View Project
Covered parking area at Akron Canton Airport with a clear blue sky in the background.
Transportation

Akron Canton Airport Entrance Road

Point Design Group identified alternatives that not only improved the pavement conditions, drainage, and lighting on the Akron-Canton Airport entrance road and parking areas but also reduced congestion in front of the terminal and simplified ingress and egress.

View Project
Multi-use bridge featuring a concrete surface and wooden railing, surrounded by trees and a pathway.
Transportation

TUS-77-32.72 Multi-Use Bridge

Point Design Group team was hired by the Stark Park District to complete the planning and design for this bridge over IR-77 that reconnects the Ohio & Erie Canal Towpath between Fort Laurens in Bolivar and the Village of Zoar.

View Project